INSURANCE PRODUCT

Contractors' All Risks

Protection for buildings, equipment and third-party risks on construction projects.

İnşaat All Risk poliçesi görseli

Policy Details

Overview

Contractors' All Risks (CAR) insurance protects building, infrastructure and plant projects under construction against sudden and unforeseen physical damage that may occur during the works. It is suitable for contractors, investors, project owners and subcontractors carrying out residential and commercial building projects. The policy can be arranged to cover the works, materials and temporary facilities on site from the start of the works until handover.

 

As an insurance broker, we analyse the type, duration and location of your project and your contractual obligations, and compare the quotes we obtain from several insurers in terms of cover and excess structure. When a claim arises, we stand on your company's side during the loss assessment and follow the file to make sure it progresses fully. We also keep track of changes and extensions to the works during the project on your behalf.

Cover

Main cover

  • Sudden and unforeseen physical damage to the works under construction
  • Fire, lightning and explosion
  • Storm, flood and inundation
  • Theft of construction materials on site
  • Damage to other parts caused by defective workmanship, depending on the policy
  • Site facilities and temporary structures
  • Debris removal costs

 

Optional additional cover

  • Earthquake and volcanic eruption
  • Third-party liability
  • Construction machinery used on site
  • Post-handover maintenance period
  • Damage to neighbouring buildings
  • Strikes, lockouts, riots and civil commotion

 

Common exclusions

  • The cost of rectifying the defectively designed part itself
  • Wear and tear, rust and gradual deterioration
  • Delay penalties and loss of profit
  • Shortages discovered only during an inventory count

Example Claims

Formwork and scaffolding damaged in a storm
During a severe storm, part of the installed formwork system and scaffolding collapses, damaging completed reinforced concrete work. Under the storm cover, the cost of rebuilding the damaged work is assessed. We organise the loss adjuster's visit and work with your technical team to ensure the damage is assessed correctly.

 

Flooding of the foundation excavation
After sudden rainfall, the foundation excavation fills with water and the slope collapses. The flood cover pays the costs of pumping out and re-excavation in line with the policy terms. We help you add photographs taken at the time of the loss, the work programme and progress payment documents to the file.

 

Theft of materials from the site
Cables and installation materials are stolen from the site over the weekend. The theft cover applies, but the insurer checks whether the security measures met the conditions stated in the policy. We prepare the file with the official police report and stock records, and follow the process through.

Frequently Asked Questions

Who should take out the policy, the employer or the contractor?
This is usually set out in the construction contract. By reviewing the insurance clauses in the contract, we clarify which party should provide which cover and help prevent double or insufficient insurance.

 

What affects the premium?
The main factors that determine the premium are the project value, construction period, building type and height, ground conditions, the natural disaster risk of the location and the chosen excess. Optional cover such as earthquake and third-party liability also affects the premium.

 

What information is needed for a quote?
The basic information is the project address, contract value, start and completion dates, the technical specifications of the structure and, where available, the ground survey and work programme. If the machinery used on site is to be insured, a list of it is also requested.

 

What happens if the construction period is extended?
The policy period is set according to the project schedule. If the works will run longer, the insurer should be notified and an extension requested before the policy expiry date. We follow this up with you to make sure there is no period without cover.

 

Is the cover the same in every policy?
No. Excesses, the approach to workmanship and design defects, and the conditions for optional cover vary by insurer and policy terms. We show these differences clearly in our quote comparisons.

The information on this page is general in nature. The scope of cover and terms are subject to the relevant insurer’s general and special policy conditions.